Resolving a Complex
Moment Connection

Redline clouds on moment connection at grid B-3. Beam-to-column flange weld detail resolved in 48 hours without RFI.

Full-pen groove weld + 8-bolt slip-critical connection. Fabricated to AISC Design Guide 24 tolerance.





Steel standing. Plumb. True. On schedule.
READY TO FABRICATE YOUR PROJECT?
Upload your drawings and we'll have a quote back in 24 hours.
300-Ft Conveyor Truss.
Installed in a 72-Hour Shutdown.

300-ft span. All connections torqued. Conveyor running by Hour 72.

W24×162 top & bottom chords. CNC plasma cut to ±1/32" tolerance.

Full-pen groove welds. UT inspected. Zero rejections on 48 critical joints.

12 loads sequenced for crane picks. Zero yard staging required.
"We had a 72-hour window before the next production shift. Forge delivered every section in pick sequence. The crane never waited. The conveyor ran on time."
Brad Weston
COLORADO AGGREGATE INDUSTRIES · PUEBLO, CO
TIGHT SHUTDOWN WINDOW?
We sequence deliveries to your crane picks. No staging yard needed.